The whole set production filling line6

The whole set production filling line6

1.        Cleaned barrels move 180 degree along with conveying chain wheel and to turn over frame. And then barrels are pushed into filling machine by barrel pushing cylinder and located on conveyor belt and wait for filling.

2.       Sterilized empty barrels to filling position are located by location cylinder, and the filling position are located by location cylinder, and then filling pump for filling. Filling time set by PLC. It can correct filling time up to optimum condition by multifunction button on panel according to height of liquid level.

   Capping process:

 After finished filling, the full barrel transports into cap gland position in transiting loading cap by loading cap position after finish capping, barrel is took out by conveying chain.

 

 

Main technical parameter:

Working station number

Four columns and eight lines

Washing nozzles

Move up and down and enter into bottle about 100mm, have eight steps of washing processes

Applied barrel

Φ276x490xΦ56mm

Filling heads

4 head

Capping mode

Chain

Capacity

600BPH

Total power

6.5Kw

Air source pressure

0.45 – 0.6MPa

Air consumption

0.25L/Min (user supply)